| 792 | 1 | Pull Boxes | 09/10/2026 02:41 PM | Las Vegas Electric, Inc. | Response Published |
|
| Question: Concerning bid item 623 0232 for the pull boxes related to the loop detectors, please advise if these pull boxes are to be installed pursuant to Std. Drawing TG-12 or TG-14. If TG-14, please advise if the fully encapsulated concrete collar and locking lid will be required. |
| Answer: Install No. 5 Pull Box (Modified) for Loop Detectors per Standard Plan Sheet TG-14. Concrete collar and locking lid are not indicated on Plans at these locations. |
|
| 793 | 2 | Steel Poles | 09/10/2026 02:41 PM | Las Vegas Electric, Inc. | Response Published |
|
| Question: Concerning bid items 623 0620 and 623 0645, Construction Note 10 on Sheet T04 directs installation of (3) Type 35B Steel Poles at this intersection, but the Signal Schedule on Sheet T06 directs installation of (1) Type 35B and (2) Type 35A Steel Poles. Please confirm that it is the intention for (1) Type 35B and (2) Type 35A Steel Poles to be installed at this intersection. |
| Answer: Yes, the intention is to install (1) Type 35B and (2) Type 35A Steel Poles. Construction note 10 was mistakenly applied to poles 04A and 04L. The schedules and structure list include the correct information. Pole 04A and pole 04L shall both be Type 35A signal poles, and pole 04R shall be a Type 35B signal pole. This will be revised in an upcoming addendum. |
|
| 794 | 3 | Emergency Vehicle System | 09/10/2026 02:41 PM | Las Vegas Electric, Inc. | Response Published |
|
| Question: Concerning bid item 623 0815, there is no direction on Sheets T04-T04B for an Emergency Vehicle Optical System to be installed. Also, the bid item quantity is (4), but it seems the intention is for there to be (1) system with (4) detectors. If so, please confirm the bid item quantity should be reduced to 1. |
| Answer: The bid item quantity should be 1, which includes (1) system with (4) detectors. This will be revised in an upcoming addendum. |
|
| 795 | 4 | Panels | 09/10/2026 02:41 PM | Las Vegas Electric, Inc. | Response Published |
|
| Question: Concerning Bid Item 623 1635, Construction Note 30 on Sheet LT05 corresponds with the Panel Schedule on Sheet LT13, but there is a second Panel Schedule directing installation of new contactors on Sheet T08. Please confirm this bid item should be increased to 2. |
| Answer: No, the bid item quantity shall not be increased to 2. A quantity of 1 is correct. There are no modifications necessary for the existing SP at Veterans Memorial Dr (shown on T03). The contactor info at the bottom of the panel schedule on sheet T08 is incorrect and will be removed in an upcoming addendum. |
|
| 806 | 5 | NATINA Stain | 09/22/2026 05:45 PM | Nevada Barricade | Response Published |
|
| Question: Do all Galvanized Materials on this project get stained with NATINA? Or is only the guardrail and fence being stained? |
| Answer: New guardrail should be treated with Natina. No other galvanized surfaces need to be treated with Natina. |
|
| 807 | 6 | Milled Rumble Strips | 09/23/2026 08:42 AM | Nevada Barricade & Sign | Response Published |
|
| Question: Which milled rumble strip Pattern Type 1, 2, or 3 as shown on standard plan page RS1 will be required for the installation of the milled rumble strips on this project? |
| Answer: Construct Type 1 Milled Rumble Strips. Revised Plan Sheets are included in the Addendum 002. |
|
| 808 | 7 | 5-section signal head | 09/23/2026 02:20 PM | Las Vegas Electric, Inc. | Response Published |
|
| Question: Addendum 1 added Signal Construction Note 13 on Sheet T02 directing installation of a 5-section signal head payable under bid item 623 2450 but that bid item is not listed in the estimate of quantities report |
| Answer: Bid Item 623 2450 was omitted from the SLI Structure List. The revised SLI Structure List will be provided in an upcoming addendum. |
|
| 814 | 8 | 2120580 Transplant Flora | 09/25/2026 10:21 AM | Soil-Tech, Inc. | Response Published |
|
| Question: Please provide Flora quantities. These quantities will help with pricing 2120395 item as well |
| Answer: There should be no more than 20 plants that need to be transplanted along the proposed new fenceline. |
|
| 823 | 9 | Soils | 09/30/2026 10:26 AM | Las Vegas Electric, Inc. | Response Published |
|
| Question: Is there a soils report for this project? |
| Answer: There is not a soils report for this project. |
|
| 840 | 10 | Follow Up Question # 5 | 10/05/2026 02:49 PM | Nevada Barricade | Response Published |
|
| Question: What is the LF of the existing guardrail that is required to be stained? The plans do not specify. |
| Answer: No existing guardrail is required to be stained. The response to question #5 has been edited to reflect this response. |
|
| 843 | 11 | Rock Mulch Color Item #2110530 | 10/06/2026 01:06 PM | Amrize Southwest Inc. | Response Published |
|
| Question: Please specify what color you would like us to bid for the Rock Mulch. |
| Answer: Per section 211.02.02 of the contract's special provision, the rock mulch color shall be dark brown. |
|