| 781 | 1 | CAD | 09/08/2026 03:46 PM | Sierra Nevada Construction, Inc. | Response Published |
|
| Question: Will CAD files be provided? |
| Answer: CAD files have been uploaded. |
|
| 782 | 2 | Solar Street lights Bid item | 09/08/2026 03:55 PM | Sierra Transportation Technologies | Response Published |
|
| Question: Will the solar luminaire and 14' aluminum pole be required to meet the new 10-1-26 BABA requirements requiring 55% american manufactured components? |
| Answer: No, they are not required to meet the new requirements as this project was obligated prior to October 1, 2026. |
|
| 817 | 3 | Bid Item Clarification | 09/25/2026 12:04 PM | Spanish Springs Construction, Inc. | Response Published |
|
| Question: Item Number 6310100 2080 SQFT of precast concrete wall panels. The Plan Sheets RW02 through reflect the number of precast panels and dimensions. The sum total from the quantity summary does not total to the bid item quantity. There is no apparent bid item for the precast posts. Are the Posts considered incidental to the panel square footage? |
| Answer: Please refer to Sheet RW-01 note #15 |
|
| 818 | 4 | Traffic Control | 09/25/2026 12:04 PM | Spanish Springs Construction, Inc. | Response Published |
|
| Question: There is currently 2 travel lanes in each direction of the alignment. Contractors are expected to follow MUTCD guidelines for temporary lane closures and signage. What is the maximum length of a closed travel lane to accommodate the construction work zone by phase?? |
| Answer: As per section 625 it is the Contractor’s responsibility to submit for approval all traffic control plans demonstrating they meet all the limitations in section 108.04 and the traffic control elements stated in section 625. These should include, but are not limited to, work zones, phases, the length of lane closures or lane shifts, and all included devices. Please bid accordingly. |
|
| 819 | 5 | Prevailing Wage Rates | 09/25/2026 12:04 PM | Spanish Springs Construction, Inc. | Unanswered |
|
| Question: The wage termination for this contract has effective dates from October 1, 2025 to September 30, 2026. The notice to proceed start date is projected to be February 1, 2026. Will NDOT inform contractors what the increased amount or percentage will be prior to the bid letting date? |
| Answer: |
|
| 820 | 6 | DBE | 09/29/2026 12:25 PM | Sierra Nevada Construction, Inc. | Unanswered |
|
| Question: Can you please confirm the Bidder DBE/SBE form, and the confirmation letters are not required? Section 102.03 number 4. |
| Answer: |
|
| 821 | 7 | GFE | 09/29/2026 12:25 PM | Sierra Nevada Construction, Inc. | Unanswered |
|
| Question: Can you please confirm the GFE is not required since the goal is 0%? Section 102.03 number 5. |
| Answer: |
|
| 822 | 8 | DBE | 09/29/2026 12:26 PM | Sierra Nevada Construction, Inc. | Unanswered |
|
| Question: Can you please confirm the Regular Dealer/Distributor Affirmation form is not required? Section 102.16 number 3 |
| Answer: |
|
| 825 | 9 | Solar Lighting | 10/01/2026 09:20 AM | MC4 Construction LLC | Response Published |
|
| Question: Can you provide specifications on the solar trail lighting poles, fixtures, solar panels, and foundations? |
| Answer: Specifications for Options A & B have been provided in Addendum 1. |
|
| 841 | 10 | TECHNICAL SPECIFICATIONS SECTION 704 TO 706 | 10/05/2026 04:16 PM | Spanish Springs Construction, Inc. | Response Published |
|
| Question: Bid item 2090110 References Special Drain Backfill. The standard specifications does not seem to contain any technical information regarding this material product. Can the Design engineer clarify what particular material included in the aggregate specifications is to be used for this element of work? |
| Answer: Please refer to section 209.02.91 of the Special Provisions. |
|
| 842 | 11 | Bid Item 6090260 | 10/05/2026 04:16 PM | Spanish Springs Construction, Inc. | Response Published |
|
| Question: Bid item 6090260 references 79 method B Manhole cover adjustments. Plan sheets references City of Reno. Can the design engineer confirm what diameter the existing precast manholes are below the existing asphalt surface?? |
| Answer: These are to be field verified by the Contractor at the time of adjustment. |
|
| 845 | 12 | Crosshole Sonic Logging | 10/07/2026 09:24 AM | Sierra Nevada Construction | Response Published |
|
| Question: Will Crosshole Sonic Logging be required for the 42" diameter drilled shafts supporting precast retaining wall? |
| Answer: Crosshole Sonic Logging testing will not be required on the retaining wall shafts. |
|
| 846 | 13 | PCI Certification for Precast Members | 10/07/2026 09:45 AM | Q&D Construction | Response Published |
|
| Question: Note 9 on Sheet RW-01 states, “All precast members, including the precast posts and wall panels, shall be fabricated in a precast plant certified by the Precast/Prestressed Concrete Institute (PCI) according to Standard Specification Section 503.01.02.” Section 503.01.02 appears to apply specifically to precast prestressed concrete. Since the wall panels on this project are not prestressed, may the panels be fabricated by a company that is not PCI certified? |
| Answer: No, the precast wall panels will need to be fabricated by a PCI certified company. |
|
| 847 | 14 | Removal of Existing 14" CCP QLD | 10/07/2026 09:45 AM | Q&D Construction | Response Published |
|
| Question: It appears that the existing 14" CCP QLD conflicts with the new drilled shafts and will need to be removed. Please clarify which bid item accounts for the removal of this line. |
| Answer: The existing 14" CCP QLD line could conflict with the new drilled shafts. This line has been abandoned and may need to be drilled through or to be removed at no direct payment. |
|
| 849 | 15 | Temporary Casing in CIDH with Precast Post | 10/09/2026 02:46 PM | Q&D Construction | Response Published |
|
| Question: Can the temporary casing specified on RW-06 remain in place permanently? The precast posts will need to be properly braced and installed prior to placement of the upper portion of the CIDH shaft. Removing the temporary casing may interfere with the required bracing system. |
| Answer: No, the temporary casing will need to be removed. |
|