| Question: The plans provided by IRD show a drain detail within the scale pit but do not identify the discharge location or the drainage piping requirements beyond the pit. Please provide the drainage outlet or connection point, pipe sizes and materials, routing, slopes, and invert elevations needed to bid and construct this work. Please also clarify whether these details will be provided by IRD or by NDOT. |
| Answer: The drainage requirements regarding the static scale will be updated in an upcoming addendum. The addendum will clearly depict the details provided by IRD and the details provided by NDOT. Additionally, the bid opening date will be extended to 10/22/2026 to accommodate the addendum. |