| 815 | 1 | Site/Technical Requirements | 09/25/2026 11:01 AM | Southern Traffic Services, Inc. (A Rekor subsidiary) | Response Published |
|
| Question: Please clarify site or technical requirements that led NDOT to specify a precast WIM installation. |
| Answer: The Department wants WIM sensors to be installed within concrete pavement to enhance resiliency, and the use of precast panels improved constructability/MOT while reducing the risk of regional concrete shortages meeting the Department’s PCCP requirements. |
|
| 816 | 2 | Installation Method Considerations | 09/25/2026 11:06 AM | Southern Traffic Services, Inc. (A Rekor subsidiary) | Response Published |
|
| Question: Section 503 specifies ProCast precast WIM panels obtained through IRD. Sections 623.02.32 and 623.02.33 also designate IRD for the WIM system and static scale system. Please confirm if these vendor designations are mandatory and will NDOT consider another installation method that meets Type 1 performance and project requirements. |
| Answer: The contractor shall procure the precast concrete slabs, WIM system, and static scale system exclusively from International Road Dynamics Corp. |
|
| 826 | 3 | 6231197 modular Building | 10/01/2026 11:58 AM | Fortiline Waterworks | Response Published |
|
| Question: is the land that the building will be sitting on federal land? |
| Answer: No. The land is owned in fee by NDOT. |
|
| 827 | 4 | Paving | 10/01/2026 02:41 PM | McCuen Construction, Inc. | Response Published |
|
| Question: The title sheet and sheet 3A describe cold milling and a plantmix overlay, but no paving items exist. |
| Answer: The department confirms that cold milling and plantmix overlay are out of scope for this contract. A forthcoming addendum will issue revised sheets for the Title Sheet and Sheet 3A removing the references. |
|
| 828 | 5 | Static scale foundation | 10/01/2026 02:41 PM | McCuen Construction, Inc. | Response Published |
|
| Question: There is no foundation or pit detail, and no removal item for the existing concrete pad it sits beside. |
| Answer: The department confirms that scale pit foundation design is provided through the scale manufacturer. Per the Special Provisions, all work necessary to complete the scale installation, including required excavation, foundation construction, and removal of the adjacent concrete pad, is subsidiary to the scale pay item. No separate pay item will be provided. |
|
| 829 | 6 | Existing WIM removal | 10/01/2026 02:42 PM | McCuen Construction, Inc. | Response Published |
|
| Question: The title says relocate the WIM, but nothing is paid for removing the old one. |
| Answer: Confirmed. The Weigh-In-Motion (WIM) system is being replaced near the existing location. Removal of the existing WIM will occur with the excavation required by precast concrete panels and is subsidiary to that work. No separate payment will be made for removal. |
|
| 830 | 7 | Cameras, data readers and communications | 10/01/2026 02:42 PM | McCuen Construction, Inc. | Response Published |
|
| Question: Neither the pay items nor the plans include any, and no conduit or cable carries data to the building. |
| Answer: The department confirms that cameras, data readers, and communications are part of the complete, turnkey Weigh-In-Motion (WIM) system. Please refer to Section 623.02.32 of the Special Provisions for system specifications and vendor requirements (International Road Dynamics Corp). |
|
| 831 | 8 | System integrator, SALT and SST | 10/01/2026 02:42 PM | McCuen Construction, Inc. | Response Published |
|
| Question: There are no field devices that would need these, are they applicable? |
| Answer: Correct, there are no ITS field devices on this project that require SALT or SST testing. The language that references the tests is standard to all project Special Provisions and can be disregarded. |
|
| 832 | 9 | Relocated building details | 10/01/2026 02:46 PM | McCuen Construction, Inc. | Response Published |
|
| Question: Please provide size, weight, utility connections of the existing building to be relocated. |
| Answer: Specific as-built weight and utility connection details for the existing modular building are not available. Bidders shall perform field measurements and site verification to determine the exact dimensions, weight, and utility disconnect requirements prior to relocation. The relocated modular will not need any utility connections in its relocated location. |
|
| 833 | 10 | Stormwater permit | 10/01/2026 02:46 PM | McCuen Construction, Inc. | Response Published |
|
| Question: Does NDOT expect Construction General Permit coverage, since the disturbance is under an acre but drains to Jackstone Creek? |
| Answer: Please refer to the contract documents for further guidance regarding stormwater permitting and bid accordingly. |
|
| 834 | 11 | Aggregate base pullout quantity | 10/01/2026 02:46 PM | McCuen Construction, Inc. | Response Published |
|
| Question: The pullout carries 0.93 CY of base, but it looks about 8.4 CY on the plans. The 0.93 looks like the 8.36 CY of excavation divided by 9. |
| Answer: Confirmed. The correct quantity for the aggregate base at the pullout is 8.37 CUYD. This adjustment will be formally addressed in a forthcoming addendum. |
|
| 835 | 12 | 623.02.34 Modular Office Building | 10/01/2026 03:00 PM | US MODULAR GROUP, INC. | Response Published |
|
| Question: Given current processing times for third party and State of Nevada Manufactured Housing approvals, estimated factory offline dates for the 12' x 30' modular office building would be 110 working days from award of contract. Will liquidated damages be assessed on the modular building portion of the scope? |
| Answer: Please refer to section 108.02 of the contract's special provisions regarding procurement of material and the "Notice to Proceed" timeframes. |
|
| 836 | 13 | Static Scale System | 10/02/2026 12:30 PM | Mc4 Constructin | Response Published |
|
| Question: Please provide details for the pit construction to include drainage and electrical penetrations. |
| Answer: Refer to Section 623.02.33 of the Special Provisions. The contractor shall contact International Road Dynamics (IRD) directly for all scale pit design details, including drainage, electrical penetrations, and installation requirements for the Mettler Toledo scale and concrete deck. |
|
| 844 | 14 | Scale Pit Drainage | 10/06/2026 04:08 PM | McCuen Construction, Inc. | Response Published |
|
| Question: The pit drawings obtained from IRD have drainage coming from the bottom of the pit. How will NDOT proceed with obtaining adequate drainage outside of and away from the pit? This is presumably outside of IRDs responsibility for design. |
| Answer: The drainage requirements regarding the static scale will be updated in an upcoming addendum. The addendum will clearly depict the details provided by IRD and the details provided by NDOT. Additionally, the bid opening date will be extended to 11/5/2026 to accommodate the addendum. |
|
| 854 | 15 | 623.02.34 Modular Office Building | 10/20/2026 10:35 AM | US MODULAR GROUP, INC. | Response Published |
|
| Question: The specifications for interior finishes on the new modular office building call for painted gypsum board walls. Sheet SD2 of the plans for the new modular office building show vinyl gypsum wall board. Please advise whether you require tape, texture and painted walls or vinyl covered gypsum wall panels in the new modular office building. |
| Answer: Provide vinyl covered gypsum wall panels with appropriate trim for all interior wall finishes, consistent with Sheet SD2. Attachment A to be updated in upcoming addendum. |
|