Details
Documents
Q&A
Vendor Proposal Submittals
Committee Results
Details - RFP 329-25-015
Adv ID:
8
Procurement #:
329-25-015
Advertised Date:
09/17/2025
Submittal Due Date:
12/18/2025 11:00 AM
Compensation Type:
Cost Plus Fixed Fee
Funding Type:
Federal
Question Deadline:
12/10/2025 11:00 AM
DBE Goal:
DBE 0.00
Status:
Awarded
County(s):
Clark County
Program Officer:
Joseph Paslov
Notice of Intent:
03/02/2026
Award Date:
06/26/2026
Successful Proposer(s):
Horrocks LLC
Project Title:
Consultant Services for the Henderson Interchange
Background:
The Department is seeking to hire one firm to provide Consultant Services for final design of the Henderson Interchange in Clark County.
Project Scope:
The successful Service Provider will coordinate their design with other disciplines being completed by the Department, and will provide professional services including, but not limited to final design of the interchange, National Environmental Policy Act (NEPA) reevaluation, right-of-way adjustments, Union Pacific Railroad (UPRR) and Utilities coordination, and updating the Interchange Access Justification Report (IAJ). See RFP for full Scope of Services.
Project Schedule:
Approximately two years from the date an Agreement is executed.
Documents - RFP 329-25-015
Solicitation Document(s)
Addenda
Q&A - RFP 329-25-015
Export to PDF
Q & A
QuestionID
ParentID
Question #
Procurement #
Topic
Submit Date
Status
27
8
1
329-25-015
Minimum Qualification Requirements
09/17/2025 03:09 PM
Approved
Question: For the role of Public Outreach Lead, is a B.S. degree in Marketing an acceptable degree?
Answer: Yes, a B.S. degree in Marketing is acceptable.
28
8
2
329-25-015
Minimum Qualification Requirements
09/17/2025 03:10 PM
Approved
Question: For the role of Public Outreach Lead, is a B.S. degree in Marketing an acceptable degree?
Answer: Yes, a B.S. degree in Marketing is acceptable.
29
8
3
329-25-015
Section III, Scope of Services (page 5)
09/24/2025 10:12 AM
Approved
Question: On page 5 under required services, the RFP outlines the Survey role as follows: "Survey, (Structures Design Support Only) Note: This work must maintain a tolerance of 0.03 feet or better o Associated MOT / Temporary Traffic Control Is the sub-bullet, “Associated MOT / Temporary Traffic Control,” intended to clarify the need for the surveyor, who is accessing the site during preconstruction, to provide MOT plans as a part of the entry permitting process? Or is this intended to be a dedicated sub-position that prepares Temporary Traffic Control/MOT for this purpose? Would this need exist for other roles that access the site prior to construction like Geotech? Can you please clarify the intent of the sub-bullet?
Answer: This is only a reminder to the applicant, should they elect means and methods, for completing this work, that require an NDOT encroachment permit, the associated Traffic Control / MOT that is needed will be considered part of this scope. As a matter of clarification, all exploratory activities, requiring access to the site during the preconstruction phase, will need to be coordinated with and satisfy the associated requirements of the District 1 permitting office. These activities, including Temporary Traffic Control / MOT are considered part of this scope. There is no requirement to designate a person who will prepare the traffic / MOT plans in support of the permitting process for the exploratory activities, however; there is a requirement to designate a “Key Person” who will prepare MOT / Temporary Traffic Control Plans for construction activities. The associated required service being - Traffic Design – Signage / Traffic Control (striping completed in-house) as shown on Page 5 of the RFP.
30
8
4
329-25-015
Prior Geotechnical Exploration Data
09/24/2025 10:15 AM
Approved
Question: Can the Department provide access to prior geotechnical exploration data (borings, laboratory test results and geophysical surveys) that may exist along the proposed project alignment?
Answer: Any available materials and/or data will be provided to the selected Service Provider at the time of Award of an Agreement.
43
8
5
329-25-015
Request for additional pages
12/01/2025 05:07 PM
Approved
Question: Will NDOT allow two additional pages to the response to the evaluation factors? Currently 12 pages per the last paragraph page 6 of RFP. Request is being pursued since proposers are now required to address the approach to phase 2 of the interchange including potential complications, high risk components and suggested solutions.
Answer: While the boundary of the Project has been adjusted to include the full interchange, the requested services have not changed and there is no need for additional pages. The total pages allowable in response to the Evaluation Factors will remain twelve (12).
Click on a row to view details
Vendor Proposal Submittals - RFP 329-25-015
Export to PDF
Vendor Proposal Submittals
Company Name
Status
Vendor ID:
61
Company Name:
Horrocks LLC
Address:
2162 W Grove Pkwy, Suite 100
City/State/Zip:
Pleasant Grove, UT, 84062
Phone:
((80) 1) -763-
Email:
khazlewood@horrocks.com
Successful
Vendor ID:
64
Company Name:
Parametrix, Inc.
Address:
City/State/Zip:
Phone:
Email:
swmarketing@parametrix.com
Unsuccessful
Vendor ID:
65
Company Name:
HDR Engineering, Inc.
Address:
City/State/Zip:
Phone:
Email:
rachel.angevine@hdrinc.com
Unsuccessful
Vendor ID:
68
Company Name:
C.A. Group, Inc.
Address:
City/State/Zip:
Phone:
Email:
james.caviola@c-agroup.com
Unsuccessful
Committee Results - RFP 329-25-015
Committee Type: